Hancock Co. Hydroelectric Plant Project

WFIE Channel 14 reported on a major project for Mulzer Crushed Stone.  American Municipal Power is building a $416 million dollar Hydroelectric plant along side the Cannelton Locks and dam.  Over the next 12 months Mulzer will supply 160 barges of quarry rock and 275 barges of sand (estimated).  Visit http://www.14wfie.com/Global/story.asp?S=10855348 to read the article and watch the video.  The Video has a shot of a Mulzer barge being unloaded.